New Connection / Load Extension Fee Calculator


     
1) Connection Type
2) New Connection / Load Extension
3) Category
4) Load applied (kW) *        LOAD CALCULATOR
  a)   Existing load if any *
  b)   Additional load required *
  c)    Total load *
5)  Demand applied (kVA) #
  a)   Existing demand if any #
  b)   Additional demand required #
  c)   Total demand #
6) Work of service connection by:
7)  Meter to be installed by:



     
1) Processing Fee Rs.
2) SGST (9%) on Processing fee Rs.
3) CGST (9%) on Processing fee Rs.
4) Security Deposit / ACD Rs.
5) Service Connection Charges Rs.  
6) Meter Security Rs.
7) MCB Security Rs.
  Total Charges Rs.